School District 59 has begun a two-week consultation with Tumbler Ridge residents on designs for a permanent new secondary school after demolition began on the former building.
The Story
Residents of Tumbler Ridge are being asked for feedback on designs for a permanent new secondary school, following the February school shooting that shook the community.
Six people were killed on Feb. 10 when 18-year-old Jesse Van Rootselaar opened fire at the northeastern B.C. school; before the attack, Rootselaar killed her mother and half-brother at their home, and she died at the school from a self-inflicted gunshot injury.
In July, School District 59 officials began demolition of the school after then-Premier David Eby said students could not return to the building where the shooting occurred.
Chad Anderson, board chair for School District 59, Peace River South, said the district is now in the stage of taking design concepts to the community for consultation on next steps toward a permanent new school build.
So far, the board has narrowed the options to two designs: one for a pre-fabricated school building and another for a site-built design.
Anderson said the school board expects to decide the construction mode after a two-week consultation period that will include a survey of Tumbler Ridge residents.
Anderson said the board expects to make a decision by late this winter, adding that the district is hoping construction can begin in the summer of 2027 depending on the selected construction mode and the timeline details.
“Hopefully, we can choose from the best features available to create a really beautiful new facility that students and staff will feel both safe and comfortable in for the long term in Tumbler Ridge,” Anderson said.
← More stories