School District 59 has begun consultations on two replacement concepts for Tumbler Ridge Secondary after a February mass shooting and the summer demolition of the former school.
The Story
Students and families in Tumbler Ridge, B.C., are getting their first look at plans for a replacement secondary school, with consultations now underway on two conceptual designs near the town hall.
The former school was demolished over the summer following the February mass shooting. The replacement concepts being presented include one prefabricated option and one traditional site-built approach.
Chad Anderson, chair of the board of education for School District 59, said both concepts include amenities such as a spacious gym and trades workshops, and that school safety and security are key factors in the designs.
According to a presentation made to residents, safety measures would include controlled access, security cameras, and a school-wide communications and emergency alert system. The plans also include an outdoor classroom, counselling offices, multipurpose spaces, and rooms for science, arts, music and foods classes.
Anderson said, “Really, we want to make sure that safety and security are key to the design, but also a level of natural welcoming and comfort for students and staff so that it'll be a fantastic return to a permanent facility,” and added that feedback is being sought from the wider community over the next two weeks.
Anderson said the prefabricated concept could be built quickly, while conventional construction could allow more flexibility in design. Safer Schools Together is working with directly affected families and first responders on the proposals.
The new school is being designed for about 225 students. Students are currently attending a temporary modular school campus while planning continues, and a prefabricated gym is also being built next to the community’s recreation centre for use until the new school opens, after which the gym would be transferred to the municipality for community use.
The project is supported by $200 million pledged by the federal and provincial governments for the new school and other infrastructure as part of community recovery plans. The designs are being developed by Vancouver-based architecture firms studioHuB and KMBR, with the U.S.-based firm Cosecure advising on safety considerations.
← More stories