Abbotsford officials say hundreds of flood improvements have been made, but they still want Ottawa to fund a long-term mitigation plan nearly five years after the 2021 flooding.
The Story
Five years after devastating flooding hit Abbotsford’s Sumas Prairie, city leaders are urging the federal government to provide more funding for long-term flood mitigation.
Abbotsford Mayor Ross Siemens said the community has “made some good progress” on flood protection since 2021, but he argued it is still “not nearly” where it needs to be. He said residents feel they are “just simply not being heard.”
The 2021 event involved heavy rain that led flood waters to breach dikes and inundate farms, including a section of Highway 1 that sat submerged as tens of thousands of residents evacuated. The area was also tested again in 2025 when the Nooksack River from Washington state breached its banks into Canada.
According to the City of Abbotsford, the Sumas Prairie is home to many multi-generational farming operations that produce about half of B.C.’s dairy, chickens, turkeys and eggs. Farmers and other residents described lingering fear and ongoing impacts from the flooding.
Siemens said the city has prioritized hundreds of improvements, including work at about 200 sites, and further upgrades are under way at the Barrowtown Pump Station, which he described as crucial to keep water out of the low-lying prairie. The province has provided $76.6 million for critical upgrades to the pump station intended to help it withstand floodwaters from the Sumas and Nooksack rivers.
However, Siemens said Abbotsford still needs about $1.5 billion in funding to execute its long-term mitigation plan, which includes more pumps, improved dikes and flood-water storage areas. He also argued the region is important beyond Abbotsford because it includes “pipelines, the energy corridor [and] the transportation corridor,” describing it as vital to the Canadian economy.
Local MP Brad Vis, the MP for Mission-Matsqui-Abbotsford, said he finds the delay difficult to understand, pointing to federal support for a port expansion in Delta and the Fraser Valley’s role in trade and food sovereignty. He described the situation as “baffling” and “mind-boggling.”
Ottawa said it is working to develop a comprehensive mitigation approach for the Sumas River Watershed Flood Mitigation Planning Initiative, including all levels of government and First Nations. Eleanor Olszewski, the federal minister of emergency management, was said to be unavailable for an interview, while her office statement indicated the federal government is looking to identify “shovel-ready” flood mitigation projects that can be advanced as soon as possible.
The federal government said a comprehensive plan for Sumas Prairie flooding mitigation remains under development. It also said that in July, Ottawa and B.C. committed up to $20 million to support mitigation efforts in the Fraser Valley for cost-shared planning and initial project management work.
Siemens said the $20 million is “a drop in the bucket,” but he said it can still be used to move engineered drawings and other work forward so projects can be “shovel ready.”
← More stories